1988 Press Photo State Transportation and Shoreline of Wisconsin Work on Erosion

$9.00

Holding back the Lake- Concrete slabs from reconstruction of the southbound lanes of the North-South Freeway were used to control erosion near the 4100 block of S. Lake Dr. in St. Francis. The project resulted from an agreement between the state Departmen

Photo is dated 1988.

Photo measures 9.5 x 6 inches.

Photo back:
Add to Wishlist